ReserveIQ

10-Year MRRP & Reserve Funding Built for Smooth Levies

ReserveIQ

10-Year MRRP & Reserve Funding Built for Smooth Levies

Dynamic 10-year reserve cash flows, automated STSMA Regulation 2 tier checks, and board-ready AGM packs - built for South African sectional title schemes and managing agents.

Plan ahead. See the reserve pressure before it becomes a surprise.

Building a 10-year maintenance plan by hand means juggling replacement dates, rising costs and reserve balances across spreadsheets. ReserveIQ brings those moving parts into one guided model, helping trustees turn scheme records into a clearer maintenance and reserve-funding outlook.

Explore component costs and replacement timing, review the PMR 22(2)-informed estimate, then compare a forward-looking cashflow that highlights when major works could put pressure on reserves.

You can load a saved .mrrp file from the top menu at any time.
  • Dynamic capex & buffer cash flows
  • Automated PMR 22 & Regulation 2 checks
  • Board-ready AGM packs & draft resolutions

A guided route from records to plan

  1. 1

    Describe the scheme

    Enter the building profile and key reserve-fund figures.

  2. 2

    Review maintenance items

    Check component lifecycles, estimated costs and expected work years.

  3. 3

    Compare the estimates

    Review the PMR 22(2)-informed component estimate alongside the 10-year cashflow outlook.

ReserveIQ supports trustee planning; estimates should be checked against current scheme records, professional advice and contractor quotations.

IMPORTANT: This Report contains estimates and assumptions and is not a physical property inspection or professional certification. Actual maintenance requirements and costs may differ materially. Read the full disclaimer in this Report before relying on the projections. Read the v1.1 disclaimer.

Trustee quick guide

Keep your scheme work safe and easy to continue

1. Regulation-compliant minimum levy (default)

Finds the lowest escalating base levy that maintains the year-end buffer, with a top-up whenever the modelled Regulation 2 floor is higher. The tier and floor are reassessed using each year's opening reserve.

2. Economic smoothed

Ignores Regulation 2 and solves an escalating levy to maintain the buffer. Pin individual years to test alternatives.

3. Goal-seek each year

Sets the lowest non-negative levy in each year so the year-end balance lands on the minimum buffer. The Regulation 2 floor can optionally be enforced.

4. Hybrid capped-step

Pre-funds future works while limiting annual upward levy changes. The Regulation 2 floor can optionally be enforced.

Set by regulation

  • The Regulation 2 floor is set by the reserve ratio (opening reserve ÷ prior-year admin levies, A₀). Below 25%: 15% of the new year's budgeted Administrative Fund contributions (A₁) (STSMA Reg 2(b)). From 25% to below 100%: the new year's admin maintenance budget. At 100% or more: no floor.
  • The PMR 22(2)-informed component estimate: (estimated cost − opening-reserve allocation) ÷ remaining life.
  • The modelled Regulation 2 floor always applies to strategy 1 and can be enabled for strategies 3 and 4; the other scenarios are illustrative.

Set by ReserveIQ (planning assumptions)

  • The minimum cash buffer is your input and is checked at each year-end, not intra-year.
  • Levies are limited to R25,000,000 per year. Strategy 1 uses an escalating base with yearly floor top-ups; goal-seek and manual levies solve each year independently.
  • The opening-reserve allocation method (accrued wear or nearest-due waterfall), which changes the PMR 22(2) schedule and so the floor.
  • Benchmark costs, lifecycles, inflation, call-account interest and the simplified interest allowance and 27% tax rate. These are not tax advice.
  • The 10-year horizon, and interest on the average balance during the year.
Illustrative scenario · Regulation 2 shortfall

Save this recovery key

Your session recovery code is:

ReserveIQ does not send recovery emails. Keep the key with your scheme records.